PART 3 - EXECUTION

3.1 EXAMINATION-INSTALLATION

  • Examine substrates with Installer present for compliance with requirements for installation tolerances and other conditions affecting performance of fabric covered tackboard panels. Do not proceed with installation until unsatisfactory conditions have been corrected.
  • Install fabric covered tackboard panels in locations indicated with vertical surfaces and edges plumb. Top edges level and in alignment with other panels, scribed to fit adjoining work accurately at borders and at penetrations.
  • Installation of Fabric Covered Tackboard Panels:
    • Apply adhesive to walls and panels or in accordance with adhesive manufacturer's specs.
    • Set fabric covered tackboard on wall and secure with 6D finish nails to hold in place until adhesive cures.
    • Set nails below surface of fabric.
    • Stretch fabric to remove any wrinkles.

3.2 CLEANING AND PROTECTION

  • Clean panels upon completion of installation to remove dust or foreign materials from the fabric, using a dry brush, a vacuum, or both.
  • Maintain conditions in a manner acceptable to the Manufacturer and Installer that ensures that the fabric covered tackboard panels are without damage or deterioration at the time of substantial completion.
  • Replace panels that cannot be cleaned and repaired, in a manner acceptable to the Architect, prior to the time of substantial completion.

    9540-3

    BACK

     

Top of Page
 
Manufacturing ]    [ Contact Us ]
 
 
Jasco Acoustical Wall and Ceiling Products
 
Manufacturing Facility
 
  1753 NE Argyle Street, Portland, OR 97211
 Phone:
503 285 0124
 Fax: 503-
503 285 5355
 
  © 1999-2015, All rights reserved

 

 

Webmaster: North Coast Consulting "Internet for Everyone"